Schedule

AMI_ReplacementMapThe schedule for meter / radio installations and cross connection control surveys is as follows:
  1. Pilot phase as defined by Area 1 in the map below.
  2. All customers with Orion radios. Approximately 400 scattered throughout the city.
  3. By area in numeric order as defined in the map below.